← All templates

Template preview · Property management

Rental inspection and repair

Record rental inspection findings and repair follow-up clearly.

A property inspection and repair plan for a fictional rental.

Sample purpose

Record rental inspection findings and repair follow-up clearly.

Audience: Property manager, Maintenance coordinator
Structure
4 sections
Criteria
12
Sources
5
Watches
3
Default approach
Review first
See the sample

Set the purpose first. Then change every section, criterion, and agent setting before anything runs.

Fictional sample

Structure and criteria

Sample content shows the shape of a useful document. Copying it is optional.

  1. 01

    Inspection context

    For this rental inspection and repair, records unit, date, access, and inspection scope.

    Review first

    Criteria

    • Records unit, date, rooms inspected and whether the tenant was present.
    • Names the inspection type and legal basis, such as move-out with consent.
    • States what was excluded from scope.

    Sources

    Sample content

    Juniper Homes found fictional paint damage and a leaking kitchen tap during a move-out inspection. Property manager Rosa Diaz inspected Unit 2B on Oct 1, 2026, with the tenant’s move-out consent. Findings are maintenance items, not a deposit decision.

  2. 02

    Condition findings

    For this rental inspection and repair, locates each condition with photo or written evidence.

    Review first

    Criteria

    • Each row has location, observed condition and a photo ID with date.
    • Separates safety-critical items from cosmetic ones, for example an active leak versus wall scuffs.
    • Distinguishes normal wear from damage in neutral wording.

    Sources

    Watches

    • Follows Inspection context

    Sample content

    LocationObserved conditionPriorityEvidence
    Kitchen sinkSlow drip under cold-water valveRepair before next move-inPhoto K2; no cabinet damage visible
    Bedroom 1Two wall scuffsRoutinePhoto B1
  3. 03

    Repair assignment

    For this rental inspection and repair, assigns repair priority, trade, and completion target.

    Manual

    Criteria

    • Each repair names the finding, trade or person, target date and a pass-fail acceptance rule.
    • Blocking repairs have a hard date before the unit can be re-let.
    • Dependencies are ordered, for example plumber before painter, with approval limits.

    Sources

    Watches

    • Follows Condition findings

    Sample content

    • ☐ Maintenance coordinator requests plumber estimate
    • ☐ Photograph repair completion and test valve for 5 minutes
    • ☐ Record move-in readiness only after repair verification
  4. 04

    Verification and closeout

    For this rental inspection and repair, verifies completion and documents tenant communication.

    Review first

    Criteria

    • Completion is checked against the acceptance rule with a dated photo.
    • Tenant communication is neutral, dated and factual.
    • Unit is marked ready only after blocking repairs are verified.

    Sources

    Watches

    • Follows Repair assignment

    Sample content

    1. 2026-10-02 · Work orderAssign sink valve check to Rosa.
    2. 2026-10-05 · Repair targetPlumber replaces valve if seal is worn.
    3. 2026-10-06 · CloseoutCoordinator uploads completion photo and test result.