← All templates

Template preview · Software

Release rollout

Ship a change in controlled stages with explicit evidence.

A staged rollout plan for a fictional product release.

Sample purpose

Ship a change in controlled stages with explicit evidence.

Audience: Release manager, Engineering manager
Structure
4 sections
Criteria
15
Sources
9
Watches
4
Default approach
Review first
See the sample

Set the purpose first. Then change every section, criterion, and agent setting before anything runs.

Fictional sample

Structure and criteria

Sample content shows the shape of a useful document. Copying it is optional.

  1. 01

    Release scope

    State what is being released and what is excluded.

    Review first

    Criteria

    • States the change in member language ('members can book conference rooms')
    • Lists at least one exclusion with a reason
    • Names one owner for scope changes
    • Names which sites or segments receive it

    Sources

    Sample content

    Harbor Desk will release room booking to two fictional sites. Calendar migration and invoice integration are explicitly excluded. Release owner: Mina.

  2. 02

    Rollout stages

    Define stages, entry evidence, and pause conditions.

    Review first

    Criteria

    • Each stage has a checkable entry condition (20 staff bookings succeed)
    • Each stage has a numeric pause trigger (cancellation rate above 10%)
    • Stages go from internal and few sites to all members
    • Each advance needs a recorded approval from the release owner

    Sources

    Watches

    • Follows Release scope

    Sample content

    StageEntry evidencePause when
    Pilot20 staff bookings succeedCancellation rate exceeds 10%.
    Two sitesPilot support volume stableAny double-booking confirmed.
  3. 03

    Release checks

    Make preflight and recovery actions explicit.

    Manual

    Criteria

    • Includes a rollback drill already completed before stage 1, with evidence
    • Each check has one named owner
    • Checks use test accounts or staging, never member data
    • At least two checks cover member-visible behavior (confirmation email, calendar sync)

    Sources

    Watches

    • Follows Rollout stages

    Sample content

    • ☐ Mina verifies booking confirmation email
    • ☐ Omar verifies rollback flag works
    • ☐ Support lead approves customer notice
  4. 04

    Rollout measures

    Track the few signals that determine whether to continue.

    Review first

    Criteria

    • Includes a member-success metric and a safety metric (double bookings)
    • Every metric has a baseline, a pause threshold and a review window
    • Support tickets are watched beside automated metrics

    Sources

    Watches

    • Follows Rollout stages
    • Searches “room booking double booked calendar sync problem” weekly

    Agent may search the web.

    Sample content

    Successful booking rate
    96%
    Double-booking reports
    0