Construction RFI

Ask and resolve a construction information gap with a clear record.

An RFI template for a fictional construction project.

Sample purpose

Ask and resolve a construction information gap with a clear record.

Audience: Project engineer, Site superintendent
Structure
4 sections
Criteria
12
Sources
5
Watches
3
Default approach
Review first
See the sample

Set the purpose first. Then change every section, criterion, and agent setting before anything runs.

Fictional sample

Structure and criteria

Sample content shows the shape of a useful document. Copying it is optional.

  1. 01

    Question and drawing reference

    For this construction RFI, identifies exact location, document, and unresolved detail.

    Review first

    Criteria

    • Cites sheet number, revision and grid or plan location of the ambiguity.
    • States one resolvable fact, not a design preference or value-engineering ask.
    • Avoids speculating on cause or solution.

    Sources

    Sample content

    Stonebridge Build is seeking fictional drawing clarification before installing lobby access panels. RFI 027 references drawing A-411 revision 3, lobby ceiling grid C4. Site superintendent Luca Moretti needs the architect’s answer by Oct 7 to avoid holding the ceiling crew.

  2. 02

    Schedule and cost impact

    For this construction RFI, states affected work and response-by date.

    Review first

    Criteria

    • Names the authorized responder per contract and the response-by date tied to the next work.
    • Counts affected elements, such as access panels, and idle crew days.
    • Costs standby with a stated labor rate; excludes profit and overhead.

    Sources

    Watches

    • Follows Question and drawing reference

    Sample content

    Affected workQuantitySchedule effectPotential cost
    Access panel size unclear at sprinkler valve3 locations1 day if unanswered$1,200 crew standby estimate
  3. 03

    Response and clarification

    For this construction RFI, records authorized answer and any revised document.

    Manual

    Criteria

    • Records the signed response, its date and exact dimension, material or sequence.
    • Notes if a revised sheet was issued, with its new revision.
    • Flags response days against the requested date.

    Sources

    Watches

    • Follows Schedule and cost impact

    Sample content

    Authorized responseRevised referenceResponder
    Use 600 x 600 mm access panel; maintain 150 mm clearanceA-411 revision 4Architect D. Rao, Oct 6
  4. 04

    Field distribution

    For this construction RFI, confirms response reached impacted site roles.

    Review first

    Criteria

    • Names each affected trade and the site contact who received the revision.
    • Records date and method of distribution.
    • Confirms superseded sheets were removed or stamped obsolete on site.

    Sources

    Watches

    • Follows Response and clarification

    Sample content

    • ☐ Luca distributes revision 4 to ceiling subcontractor
    • ☐ Remove superseded drawing from site set
    • ☐ Confirm field dimensions before closing ceiling